An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

A . An additional switch for the new HMC B . Asynchronous adapters on the new HMC C . The two 570 servers are directly connected to the new HMC D . One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

时间:2022-10-13 22:51:28 所属题库:IBM(000-104)题库

相似题目