A loaded hopper barge with independent tanks has a placard,with alternating red and white quadrants,on each side and end. Which statement concerning this barge is TRUE?()
相似题目
-
Compliance with the terms of the load line certificate on a ship is the responsibility of the().
-
You have orders to drop off a barge loaded with propylene oxide at a fleet.In doing so,you must ensure that().
-
If you have a liquefied flammable gas barge in tow,which is NOT required of you with respect to the barge and its cargo? ()
-
What is NOT a problem area when loading barges on a LASH type vessel? ()
-
With a purely () load the voltage and current are in phase, giving a power factor of one.
-
Compliance with the terms of the load line certificate on a vessel is the responsibility of the().
-
You intend to tow a barge with one tug and expect continuous high winds from the north. To reduce the yaw of your tow,you should().
-
You are configuring a JMS server with a need for load balancing the messages. To achieve the load balance you should ().
-
You are on a multiple-product chemical tanker with orders to load diethylamine. What is NOT a requirement for transporting this cargo?()
-
What is NOT a requirement of the reinspection for a tank barge with a certificate of inspection valid for two years? ()
-
A spring-loaded centrifugal flyweight governor responds to reduced engine load with an immediate increase in ()
-
The load chart of a crane enables the operator to combine the load radius with boom length to determine the().
-
With a given load on the cargo hook,tension in a single span topping lift().
-
What is not accepted as the required shipping paperson a manned and loaded tank barge?().
-
Which parameter allows SQL*Loader to load data into a table with the indexes in the unusable state, prior to the load operation?()
-
With VIT the start of injection may be () as the engine load is reduced within a certain range.
-
You are on a multiple-product chemical tanker with orders to load diethylamine.What is NOT a requirement for transporting this cargo().
-
Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner?().
-
You are making tow.A loaded,open-hopper barge with independent tanks has placards,with alternating red and white quadrants,located at each side and end.You inspect the barge and find slight traces of water in the wing voids due to condensation.What().
-
The greatest strain,when lifting a load with the jumbo purchase,is on().
-
A loaded hopper barge with independent tanks has a placard,with alternating red and white quadrants,on each side and end.Which statement concerning this barge is TRUE ________.
-
With a purely resistance load the voltage and current are in phase, giving a power factor of _____.
-
A vessel is equipped with two ships service generatorsGenerator 1 is rated at 900 kW and generator 2 is rated at 600 kWDuring parallel operation, with a hotel load of 1,000 kW, what should be the kW load on generator 2 _____.
-
Your vessel is loaded with nonhygroscopic cargoes and is going from a cold to a warm climate.You should ______.