A p5-550 with AIX 5.3 is being designed for availability. In addition to providing redundant adapters, which of the following should also be provided?()
相似题目
-
An administrator migrates from AIX 5.3 to AIX 6.1. Upon completion, a client questions why files are missing from /tmp. How should the administrator respond to the client?()
-
While using the smit install_remove menus to remove some filesets on an AIX 5.3 server, a system administrator notices the /usr filesystem is now unnecessarily large. Which of the following actions will reduce the size of the /usr filesystem ()
-
An administrator plans to use bootable AIX media to boot a system into maintenance mode. The system is running AIX 5.3 TL09 with a64-bit kernel.The administrator has a selection of media available. Which media should the administrator use?()
-
Which of the following is a key advantage of AIX v5.3 over AIX v5.2?()
-
In AIX Version 5.3, a system administrator wants to create a bootlist for normal bootups from a file named /bootlist.norm. Which of the following is the proper command to accomplish this?()
-
Company.com has a 2 processor license for SLES 9 and a 2 processor license for AIX V5.3. Which of the following LPAR configurations is valid on a 4-way p5-550?()
-
An administrator is installing AIX 6.1 on a new LPAR and the boot sequence has stalled with reference code 0c31. What is the most likely cause?()
-
A System p administrator plans to install a new system with AIX 5.3 TL5 using a NIM server. Which of the following provide post install diagnostics()
-
Which of the following is required to connect a partitioned p5-550 to a modem?()
-
An administrator is installing AIX 6.1 on a new LPAR and the boot sequence has stalled with reference code 0c31. What is the most likely cause?()
-
A customer is moving to AIX from a competitor’s product. They need onsite assistance with the initial software installation of the new servers. Which of the following services offerings would be most appropriate to recommend?()
-
On a rigid liferaft (SOLAS B pack) which is equipped with all of the required equipment you may NOT find a().
-
Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()
-
A manufacturing customer has an existing SAN for their AIX servers and they want to add theirWindows servers with file level access to their existing storage pool. Which of the following is thelowest cost solution?()
-
An administrator migrates from AIX 5.3 to AIX 6.1. Upon completion, a client questions why files are missing from /tmp. How should the administrator respond to the client?()
-
Companycom needs to run a 32 bit kernel under AIX 5.3. What steps need to be done to accomplish this with the least disruption since the system is already installed with a 64 bit kernel?()
-
In AIX Version 5.3, a system administrator wants to create a bootlist for normal bootups from a file named /bootlist.norm. Which of the following is the proper command to accomplish this()
-
An administrator is installing AIX 6.1 on a new LPAR and the boot sequence has stalled with reference code 0c31. What is the most likely cause?()
-
A system administrator has a pSeries p5-520 2-way with AIX 5L V5.2 with a peak utilization of 50%. There is a request to add a new Web server for a small department. Which of the following solutions is the best fit for this environment?()
-
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()
-
A pSeries technical specialist is designing a p5-550 LPAR solution which will contain four logical partitions. Which tool should be used to ensure adherence to all partition rules?()
-
An administrator has received an update CD with the latest technology level for AIX 5.3. The current operating system level of the server is at base AIX 5.3. What action needs to be taken to apply the new technology level to the server?()
-
The output of an AND gate with inputs A, B, and C is a 1(HIGH) when
-
As I have given up trying to convince her, _____.<br/>A: there is no point to argue with her<br/>B: there is no point arguing with her<br/>C: it is no point arguing with her<br/>D: it is no point to argue with her<br/>
推荐题目
- 一根导爆管有两个或两个以上的死结时,不会产生拒爆。()
- 电子银行运营变更,具体应该包括()。
- 前台工作人员除须依法进行相关登记外,还应对发现的可疑事件、可疑人员、可疑物品进行()。
- 马丁・威茨曼以提出()项目而著名。
- 金属脚手架工程安全技术交底内容正确的是()。
- 医院感染指住院病人在医院内获得的感染,包括哪些?()
- 联合收获机的一般构造及工艺流程?
- You plan to deploy the Virtualization technologies of Microsoft Desktop Optimization Pack (MDOP). You need to recommend a licensing solution for the planned deployment. What should you include in the recommendation?()
- 7.党的根本组织原则是()(2.0分)
- 男,30岁。双侧髁突高位骨折且有前牙开牙合,后牙早接触,治疗上宜选用()