On a ship crane,the load chart relates the allowable load to the combination of boom length and().
相似题目
-
Compliance with the terms of the load line certificate on a ship is the responsibility of the().
-
Please arrange for the workers to do the()work during loading the trucks and heavy cargo on the ship,and also supply the necessary materials for the work.
-
On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().
-
The stevedores()load your ship in a few days.
-
The hoist line primarily used for lifting personnel on ship cranes is called the().
-
If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().
-
The system of derricks and winches has been largely replaced on newer ships by cranes()it is very efficient.
-
Stanchions prevent the entire deck load on a ship from being carried by the().
-
The reason for the obligation to load a full cargo()that otherwise the Shipowner would lose freight on account of some part of the ship’s carrying capacity not being utilized.
-
A load line of a ship is assigned by the().
-
A ship is responsible for the cargo loaded or unloaded().
-
On commonly used ships,if two A√Cgenerators are operated in parallel, the load is distributed evenly by ().
-
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().
-
The deck loads on a ship are distributed through the deck beams to the().
-
The load chart of a crane enables the operator to combine the load radius with boom length to determine the().
-
In cargo crane, () for lifting the load.
-
The displacement of a ship is to the total weight, all told, of the relevant loaded ship()
-
A load line for a ship is assigned by the().
-
The boom indicator on a crane will indicate the().
-
A ship crane which has been idle for a period of over six months shall be inspected to the same standards as a().
-
Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().
-
The design specifications for cranes and crane foundations on ship’s are set and published by the().
-
A vessel is equipped with two ships service generatorsGenerator 1 is rated at 900 kW and generator 2 is rated at 600 kWDuring parallel operation, with a hotel load of 1,000 kW, what should be the kW load on generator 2 _____.
-
Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the mid-ship section results in the load’s ______.