An enterprise has plans to start adding IPv6 support. The initial deployment requires support from some IPv6 - only device s that need to access servers that support only IPv4. Which of the following tools would be most appropriate?()
相似题目
-
Your company has an Active Directory domain. All servers run Windows Server 2008 R2. Your company uses an Enterprise Root certificate authority (CA). You need to ensure that revoked certificate information is highly available. What should you do()
-
Your company has an Active Directory forest. All domain controllers run the DNS Server server role.The company plans to decommission the WINS service.You need to enable forest-wide single name resolution.What should you do?()
-
An administrator plans to use bootable AIX media to boot a system into maintenance mode. The system is running AIX 5.3 TL09 with a64-bit kernel.The administrator has a selection of media available. Which media should the administrator use?()
-
Your company has an Active Directory domain. All servers run Windows Server 2008. Your company runs an Enterprise Root certification authority (CA). You need to ensure that only administrators can sign code. Which two tasks should you perform()
-
Your company has client computers that run Windows 7 Enterprise. You need to provide 10 users with an additional operating system boot option. What should you do?()
-
A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()
-
The EMPLOYEES table has six indexes and DML operations are slow. Which command begins monitoring the EMPLOYEE_IDX_FK index to determine whether it has been used by an execution plan?()
-
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
-
A customer has bought an IBM System Storage DS8700 and wants to attach ten SuSE Linux Enterprise Server hosts to the DS8700 with multiple paths. What is the Multipathing Driver the customer needs()
-
Your company has an Active Directory domain. All servers run Windows Server 2008 R2. Your company uses an Enterprise Root certificate authority (CA). You need to ensure that revoked certificate information is highly available. What should you do()
-
Your company has an Active Directory forest. All domain controllers run the DNS server role. The company plans to decommission the WINS service. You need to enable forest-wide single name resolution. What should you do?()
-
Your company has a single Active Directory Domain Services (AD DS) domain and 1,000 client computers. You are planning to deploy Windows 7 Enterprise to the client computers. You need to design a zero-touch installation strategy.()
-
A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()
-
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
-
Pit No. 4 has been planned to house the headquarters.
-
The idea of working for state-owned enterprises has little________to young peoplenowadays.
-
Which of the following is not an input to quality planning?
-
Showing consideration to colleagues in an open plan office can be done by adopting the following "open plan office" protocols:
-
Enterprise Resource Planning is a way to ()the dataand processes of an organization into one single system.
-
Whatever one has planned to do is ________ to be altered (改变) in the process.
-
Where has Orascom Telecom planned to set up a third generation mobile network?
-
Showing consideration to colleagues in an open plan office can be done by adopting the following 'open plan office' protocols:
-
Quality management ensures that an organization product or service is consistent. It has four main components: quality planning, quality assurance()and quality improvement.
-
What measure has been planned to save costs?
推荐题目
- 封吊井前进行系统分层分段试压,试压后冲洗管道,合格后可封闭吊顶。吊顶材料在管箍口处开一个()mm的小孑L。
- 遗体清洁处理操作时的要求,表述不正确的是()。
- 普通混凝土小型空心砌块(GB8239-1997)标准适用于工业与民用建筑用轻集料混凝土小型空心砌块。
- 从冲突的性质来分析,冲突有()
- 患儿男,9岁。因不规则发热1个月,发现心脏杂音1周入院。既往体健,否认先天性心脏病史及风湿热病史。体检:T37.8℃,R22次/分,扁桃体Ⅱ度肿大,未见脓点,双肺呼吸音稍粗,心率120次/分,心尖区可闻及收缩期吹风样杂音。四肢关节无红肿。 关于该病发病机制的特点下列叙述正确的是()。
- 以下选项中不属于山水画名家所说的“荆关董巨”的是?()
- 药熨法的禁忌证是
- 以下哪些选项不属于集群功能?()
- 辙叉心宽40mm断面处,辙叉心垂直磨耗,60kg/m及以上钢轨,在到发线上超过mm为高锰钢整铸辙叉轻伤标准()
- 材料如下,回答5-6题李想是很多老师头疼的学生,成绩不佳,影响课堂教学,还拉着几个伙伴一起搞破坏。王老师进行家访了解到李想喜欢画漫画,所以鼓励他作为班上美术课代表,李想画的不错,之后成绩也略有提高。之后王老师让他和其他几个同学一起合作制作黑板报,受到了其他同学的赞赏,李想因此有所改善。然后王老师还送了一份以李想为原型的人物漫画给他,并告诉他是自己学习2个月后画出来的第一幅漫画。王老师又一次与李想展