A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy. Which of the following statements correctlydescribes the dual HMC environment? ()
相似题目
-
A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()
-
One of your customers has deployed a Layer 3 gateway in the untrusted network. Which gateway mode is appropriate for this customer?()
-
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
-
A customer has an EMC Symmetrix DMX-4 installed. The disk subsystem is coming off lease. The customer is considering an IBM System Storage DS8800. What is a key advantage of the DS8800()
-
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
-
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
-
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
-
A customer has been receiving warning alerts on their storage units. All data is protected nightlyby a backup and has been tested without any issues. What should the customer do prior tocontacting IBM Support?()
-
A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()
-
A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()
-
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
-
A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()
-
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()
-
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
-
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()
-
A customer has the need for performance monitoring of an IBM System Storage DS8000. Which product does the customer need()
-
A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()
-
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()
-
A customer has a requirement for a storage solution that meets the following criteria: (1)Heterogeneous hosts attached (2)Support for block I/O (3)High Speed (4)Scalable Which solution would satisfy the customer’s requirement?()
-
A customer is unsure how POWER7 processors can outperform POWER6 processors when the clock speeds are slower. What contributes to the improved performance?()
-
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
-
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
-
A customer has a requirement for Disaster Recovery for compliance within their industry. Theyhave an RPO of 4 hours and an RTO of 24 hours. Cost is a consideration. What is the most costeffective DR implementation?()
-
Our company has a _ way of dealing with difficult customers.
推荐题目
- 要求堤坡平顺,顺坡方向10m范围内凸凹小于5cm。
- 社区矫正的工作程序是什么?
- 一贯煎中重用生地黄,意在()
- 保障公路()是公路养护区(站、道班)的基本任务
- 因保护国家重点保护野生动物,致使当地农户的庄稼、牲畜受到损失,应()。
- 某男性患者,20岁,头顶黄褐色斑块20年,出生即有,缓慢增大,皮损局限,表面肥厚呈疣状,皮损处完全秃发。可诊断为:()
- NO 供体药物
- 任何砂眼麻皮坑中都有包浆渗透。
- 硬光没有明显的方向,被摄物体光布均匀,层次细腻,效果柔和,常用作辅助光。()
- 《民事诉讼法》规定,被执行人未按判决、裁定和其他法律文书指定的期间履行给付金钱义务的,应当加倍支付迟延履行期间的债务利息。被执行人未按判决、裁定和其他法律文书指定的期间履行其他义务的,应当支付迟延履行金()