The discharge rate or capacity of a centrifugal pump will vary directly as the ().
相似题目
-
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
-
Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel? ()
-
How is the Master or operator of a vessel required to keep the crew informed of the regulations concerning the discharging of garbage overboard?().
-
During loading or discharging, the tallymen must make contact with()on duty so as to solve problems in time.
-
No discharge into the sea shall contain()in quantities or concentrations which are hazardous to the marine environment or chemicals or other substances introduced for the purpose of circumventing the conditions of discharge specified in MARPOL 73/78.
-
When the garbage is mixed with some discharges having different disposal or discharge requirements, shall apply()
-
During loading or discharging,the tallymen must make contact with()on duty so as to solve problems in time.
-
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
-
At any rate ()is liable for delay in obtaining the necessary Customs House papers for discharging,when the delay arises from the fact that special papers are required for the particular cargo carried.
-
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
-
() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.
-
You’d better()the optional cargo block stowage in the tweendecks, then it can be easily discharged either at Shanghai or Dalian.
-
Oil Pollution Regulations require any transfer or discharge of oil or oily mixtures to be recorded in the ()
-
All lighterage in or off ports of loading or ports of discharge shall be for the account of ().
-
The port clearance for a ship should be granted()the completion of loading or discharging in the port.
-
The combined fan discharge rate in an inert gas system is related to the().
-
The total quantity of oil discharge into the sea()for existing tankers 1/15000 of the total quantity of the particular cargo or which the residue formed a part().
-
Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().
-
If the Charterer loads or discharges the vessel in a shorter time than is allowed to him by the lay days,he may be entitled to().
-
Through a () pump, the liquid is transferred from the suction to the discharge by the mechanical variation of the volume of a chamber or chambers.
-
A vessel sailing through the specific special areas may discharge or dispose of ().
-
The pollution prevention regulations do not apply to the transfer or discharge of ()
-
53. When the garbage is mixed with other discharge having different disposal or discharge requirements the _____
-
The following sentence is True or False? \Being a few minutes late is no reason for discharging her.\( )
推荐题目
- 4%尼泊金溶液()
- 很少有热塑性的水溶性聚合物用于涂料,是因为()。
- 患儿男,6岁。发热伴右耳下疼痛3天,腹痛半天,入院。查体:体温40℃,右腮腺肿胀压痛明显,右上腹压痛,无反跳痛。护士考虑该患儿可能是腮腺炎并发()
- 物流系统设计的基本原则中的经济性的原则是什么?
- 轮机装置安装完毕后,应按审批的试验大纲,进行()
- “与会国深信,新解放的国家的出现将有助于缩小集团对立的地区,从而鼓舞旨在加强和平以及促进独立与平等的国家之间和平合作的趋势。”该会议的召开()
- 男性,60岁。乏力,疲倦半年,1个月来低热、纳差来门诊。体检:轻度贫血貌,颈部可扪及多个蚕豆大小淋巴结,质坚无压痛,肝未扪及,脾肋下2cm。化验:Hh8lg/L,WBC48×10<sup>9</sup>/l,血小板125×10<sup>9</sup>/L,分类中性粒细胞0.22(22%),淋巴细胞0.75(75%),M0.03(3%),网织红细胞0.12(12%),Coombs试验(+)。患者最可能诊断是()
- 对于同一电容C如接在不同频率的交流电路中时,频率越高则容抗越大。
- “实”的病机根本在于:()
- 陈列费用支持形式()