In a traffic separation scheme, when joining a traffic lane from the side, a vessel shall do so_
相似题目
-
There are two classes of vessels which,to the extent necessary to carry out their work,do not have to comply with the rule regarding traffic separation schemes. One of these is a vessel().
-
In a VoWLAN deployment, It is recommended()dBm separation between cells with the same channel.
-
Which two code fragments will execute the method doStuff() in a separate thread?()
-
A vessel navigate in areas near the termination of traffic separation schemes shall do()with particular caution.
-
Traffic separation schemes established by the International Maritime Organization().
-
A vessel not using a traffic separation scheme shall avoid()by as wide margin as practicable.
-
A traffic separation zone is that part of a traffic separation scheme which().
-
In a traffic separation scheme, when joining a traffic lane from the side, a vessel shall do so().
-
In a VoWLAN deployment, It is recommended()dBm separation between cells with the same channel.
-
A vessel may enter a traffic separation zone().
-
A vessel using a traffic separation scheme shall().
-
Traffic separation schemes adopted by the IMO are listed in().
-
A vessel when joining or leaving from the side of a traffic separation scheme shall do so at as()to the general direction of traffic flow as practicable.
-
A vessel not using a traffic separation scheme shall avoid it by as wide a()as is practicable.
-
A vessel using a traffic separation scheme shall normally join or leave a traffic lane at the ()of the lane.
-
() is not likely to be a methods of Traffic Separation.
-
In a traffic separation scheme,when joining a traffic lane from the side,a vessel shall do so().
-
A vessel using a traffic separation scheme shall so far as practicable()a traffic separation line or separation zone.
-
() is a circular traffic lane used at junctions of several routes,within which traffic moves counterclockwise around a separation point or zone.
-
38. A traffic separation zone is that part of a traffic separation scheme which ______
-
A traffic separation zone is that part of a traffic separation scheme which ______.
-
62.In results section, all results deserve a separate table or figure.
推荐题目
- 任何一种考评方法,都必须体现()的要求,即考评方法应充分满足组织绩效管理的需要,能在实际考评中推广应用。
- 下列对免征关税税额表述正确的是()..
- 2岁患儿,水肿20天,血压90/70n硼Hg,尿蛋白(+++),RBC1~2/HP,血白蛋白23g/L,血尿素氮5.5mmol/L。该患儿最可能的肾病理改变()
- 通常安设在气源厂、燃气压送站、分配站、储罐站、输配管网和用户处的是()。
- 简述行程限位器的作用。
- 在渠道设计中,产品体积大、单位价值高、技术性强、较为耐用的新产品,一般采取()
- 企业信息资源不包括()
- “不走回头路”是不是为什么?
- 对于“癥瘕”的痰湿瘀结证,应选用的治疗法则是()
- Q__20812:依照法律规定实施限制公民人身自由的行政强制措施,除应当履行普通程序的规定外,还应当场告知或者实施行政强制措施后立即通知当事人家属实施行政强制措施的行政机关、地点和期限()