The estimated cost to complete (ETC) is _____.A.BCWP/ACWPB.the forecasted and final cost -
相似题目
-
Preliminary estimation puts the figure at around $110 billion,()the $160 billion the President is struggling to get through the Congress.
-
In approximating costs, the estimator considers the possible causes of variation of the cost estimates, including() .
-
You are maintaining the SALES database for an organization. You have enabled the Flashback Database feature and want to estimate the flashback space required for future operations. Which view would you query to estimate the flashback space required?()
-
A system administrator needs to configure dump devices for the system. Which command would be used to estimate the size required for a dump device?()
-
In approximating costs, the estimator considers the possible causes ofvariation of the cost estimates, including()
-
The Beaufort scale is used to estimate the().
-
Sure! By the way, can you also send me the estimates of the cost to use these facilities?好的,顺便也请您把用这些设施的准确费用发给我好吗?
-
Abudget uses predicted or estimated revenues and costs.
-
Using the total cost concept of applying the cost-plus approach to product pricing, all costs of manufacturing the product plus the selling and administrative expenses are included in the cost amount to which the markup is added()
-
()is the process of obtaining the stakeholders’ formal acceptance of the completed project scope.Verifying the scope includes reviewing deliverables and work results to ensure that all were comp
-
The inventory method that assigns the most recent costs to cost of good sold is
-
Chair Co has developed a new type of luxury car seat. The estimated labour time for the first unit is 12 hours but a learning curve of 75% is expected to apply for the first eight units produced. The cost of labour is $15 per hour. The cost of materials and other variable overheads is expected to total $230 per unit.
-
A portfolio manager uses her valuation model to estimate the value of a bond as 125.482.Using the same model, she estimates that the value would increase to 127.723 if interest rates fell 30 bps and would decrease to 122.164 if interest rates rose 30 bps.Using these estimates, the effective duration of the bond is closest to:()。
-
ADREN Company purchased a deliver truck for $77,500 in 2009. ADREN expected to use the truck for 8 years, and estimated the salvage value to be $5,600. Additionally, ADREN estimated driving the truck
-
A firms estimated costs of debt, preferred stock, and common stock are 12%,17%, and 20%, respectively. Assuming equal funding from each source and a marginal tax rate of 40%, the weighted average cost
-
Pholep Productions is estimating the weighted average cost of capital (WACC). They have several pieces of data to consider. The firm pays 60 percent of its earnings out in dividends. The return on equ
-
A machine originallyhad an estimated useful life of 5 years, but after 3 complete years, it wasdecided that the original estimate of useful life should have been 10 years. Atthat point the remaining cost to be depreciated should be allocated over theremaining:
-
Grandparents are funding a newborn&8217;s future university tuition costs, estimated at $50,000/year for four years, with the first payment due in 18 years. Assuming a 6% effective annual rate, the r
-
The()of people playing soccer had grown from an estimated 500,000 in 1973 to about 60000
-
Estimating schedule activity costs involves develo...
-
Faye Harlan, CFA, is estimating the cost of common equity for Cyrene Corporation. She prepares the following data for Cyrene:
-
In December 2012 the structural deficit was estimated to be $325 billion and the cyclical deficit was estimated to be $700 billion. The total deficit equaled () billion.
-
Grant Company has decided to change the estimate of the useful life of an asset that has been in service for 2 years. Which of the following statements describes the proper way to revise a useful life estimate?
-
A company entered into a contract on 1 January 20X5 to build a factory.The total contract revenue was $2.8 million.At 31 December 20X5 the contract was certified as 35% complete.Costs incurred during the year were $740,000 and costs to complete are estimated at $1.4 million.$700,000 has been billed to the customer but not yet paid.
推荐题目
- 警示性意义的世界文化遗产地,波兰奥斯维辛集中营,内容陈述?
- 新安装保护装置在投入运行一年以内,未打开铅封和变动二次回路以前,保护装置出现由于调试和安装质量不良引起的不正确动作,其责任归属为()
- 明白的含意是()
- 金融期货与金融期权的区别为()。
- 砖筒拱砌筑时,砖块应()抹砂浆,采用()抹灰砌筑法.
- 根据可靠性要求,企业会计核算应当做到()。
- 在人体许多生理功能活动中,扩散是体内物质转运的方式之一( )
- 我国现行的税收管理主要包括( )和其他。
- Thailand().doc The people 2. The _______in Southwest China and the Thai people of Thailand, in fact, belong to the same ethnic 种族的 group.
- 5、(续)求E的Huffman编码。