When loading or discharging dry mud or cement,crew members should use goggles and().
相似题目
-
When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().
-
Notice of Readiness to Load must be served()the Charterer or his agent.
-
What is not usually a concern when loading a single-hulled tanker?()
-
The ship will be responsible for the cargo loaded or unloaded().
-
When loading a container vessel,the operation is basically that of vertical loading. The important factors to be considered when loading containers are port of discharge,().
-
Atmospheres laden with coal dust or grain dust caused by loading these cargoes().
-
A ship is responsible for the cargo loaded or unloaded().
-
Notice of readingness to load must be served()the charterer or his agent.
-
Atmosphere laden with coal dust or grain dust caused by loading these cargoes().
-
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().
-
Fuels of different qualities may require advancing or retarding the injection timing, in addition to which if the injection timing is advanced when the engine is running at loads below the (), then a saving in fuel can be achieved.
-
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
-
All lighterage in or off ports of loading or ports of discharge shall be for the account of ().
-
The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.
-
()cargo means to check all cargo loaded into or discharged from a vessel.
-
When a diesel engine is operate at partial load, as compared to full load ,a decrease will occur in the average ()
-
When loading or unloading baled cargo on board,the straps()to lift or drag the bales.
-
When a sentence is loaded with big words, high-sounding phrases, or pretentious language; it will sound artificial, flowery, and pompous. It is called overwritten style.
-
FCL means the loading reaches its allowable maximum weight or full measurement.
-
103. When loading or discharging dry mud or cement, crew members should use goggles and ______.
-
A vessel which has brought any imports or has loaded exports can leave the port only when written permission, known as "port clearance", is granted by the local authorities. ()
-
When loading a container vessel,the operation is basically that of vertical loading.The important factors to be considered when loading containers are port of discharge,______.
-
A ship cannot start loading or discharging without Customs permission.()
推荐题目
- 至尊卡客户除享有钻石卡客户的所有服务外,还享有()
- 贯穿于企业经营管理全过程,且与企业所有管理活动都相联系的管理活动称为()工作。
- 北宋大名府属于下列哪个军区?()
- 缺O2对呼吸的影响是()
- 在Word 2003中,有两种方法可以设置图片格式,一是(),二是()。
- 在计算日前计划设备潮流准确率时,220kV电压等级设备潮流计算偏差门槛为()。
- 文体是指文章的()。
- —Victor, your radio is too loud.Your partner is writing her composition
- 下列关于消费税的纳税义务发生时间的表述正确的有()
- 将室内110V电压变为信号机室外电气设备所需电压,并能提供不同的输出电压的是()