With a purely () load the voltage and current are in phase, giving a power factor of one.
相似题目
-
Compliance with the terms of the load line certificate on a ship is the responsibility of the().
-
A lifeboat is weight tested by lowering to near the waterand loading to capacity with weight evenly distributed. Itis then lowered into the water and released. This test mustbe done at least once every().
-
Increasing the load on an engine equipped with a constant speed mechanical governor, will cause the engine speed to initially ().
-
It’s a configuration that experts are calling a "firewall sandwich," with the second firewall providinga second level of load balancing after traffic down. What is meant by the term "firewall sandwich"?()
-
On a router that is configured with multiple IP SLA probes, which command can be used to manage the CPU load that was created by the periodic probing?()
-
Compliance with the terms of the load line certificate on a vessel is the responsibility of the().
-
You are configuring a JMS server with a need for load balancing the messages. To achieve the load balance you should ().
-
On a router that is configured with multiple IP SLA probes, which command can be used to manage the CPU load that was created by the periodic probing?()
-
The load chart of a crane enables the operator to combine the load radius with boom length to determine the().
-
With a given load on the cargo hook,tension in a single span topping lift().
-
If a container which has not been filled,packed,stuffed or loaded by the Carrier is delivered by the Carrier with the seal(),such delivery shall be deemed as full and complete performance of the Carrier’s obligation.
-
Which parameter allows SQL*Loader to load data into a table with the indexes in the unusable state, prior to the load operation?()
-
The loading of the ship must be done in accordance with().
-
With VIT the start of injection may be () as the engine load is reduced within a certain range.
-
A customer with a single IBM System Storage DS8100 reports severe performance problems for some of their applications when a particular data warehousing application creates a heavy load. What is the most cost effective way to resolve this issue()
-
You are making tow.A loaded,open-hopper barge with independent tanks has placards,with alternating red and white quadrants,located at each side and end.You inspect the barge and find slight traces of water in the wing voids due to condensation.What().
-
The greatest strain,when lifting a load with the jumbo purchase,is on().
-
84. The loading of the ship must be done in accordance with _____.
-
With a purely resistance load the voltage and current are in phase, giving a power factor of _____.
-
You are in a tropical port.The refrigeration machinery on a container loaded with air-cooled fruit fails.It cannot be repaired for 18 to 24 hours.Which step should you take to reduce the temperature rise and spoilage of the fruit ________.
-
A vessel is equipped with two ships service generatorsGenerator 1 is rated at 900 kW and generator 2 is rated at 600 kWDuring parallel operation, with a hotel load of 1,000 kW, what should be the kW load on generator 2 _____.
-
With V1T the start of injection may be _____ as the engine load is reduced within a certain range.
-
A lifeboat is weight tested by lowering to near the waterand loading to capacity with weight evenly distributed. Itis then lowered into the water and released. This test mustbe done at least once ever
-
Assume the miss rate of an instruction cache is 2% and the miss rate of the data cache is 5%. If a processor has a CPI of 1.5 without any memory stalls and the miss penalty is 50 cycles for all misses, determine how much faster a processor would run with a perfect cache that never missed. Assume the frequency of all loads and stores is 36%. the speed with a perfect cache that never missed / the speed with a cache that will miss=______(number only, keeping 4 significant digits)