In ()the control action is independent on the output.
![](/upload/20220827/c85071da6ff0aadc10ebce6c25bb4f0d.png)
相似题目
-
Which of the actions listed should be taken FIRST to control an oil fire in a fuel oil tank?()
-
The series of valves used to control the return flow in well control operations is called the().
-
From the passage, we can learn that the simplest controller action is()
-
The order of importance in addressing damage control on a ship is().
-
The most variable factor in the control of broken stowage is().
-
You create a server control that inherits from WebControl. You need to enable the server control to emit markup for a new kind of mobile device. You must not alter the code in the server controls. Which two actions should you perform?()
-
The FIRST course of action in fighting a fire in a cargo or fuel oil tank is to ().
-
()is the management system to control the material consumed, reduce inventory in the manufacture company.
-
In fighting a fire in a fuel tank, the FIRST action you should attempt is to ().
-
This arrangement is () if the elements are directly connected to one another and the control action takes place without human involvement.
-
What is the action of "pop" in the context of MPLS switching?()
-
Hydraulic control check value is generally used to () in the marine hydraulic mechanism.
-
The order of importance in addressing damage control is().
-
A system administrator wants to control the HMC from their workstation. Microsoft Windows 2000 is running and the HMC graphical user interface is being used remotely. Which of the following actions will accomplish this task?()
-
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is watched by duty personnel.
-
()is the management system to control the material consumed reduce inventory in the manufacture company.
-
The control mode in which the final control element is moved from one of two flexed positions to the other is known as ().
-
The principal action in changing from transit to survival draft in the event heavy weather threatens is().
-
The additional mark () in the Classification Certificate for Machinery represents the propulsion apparatus is remotely controlled on the navigating bridge control station, and engine room is watched by duty personnel.
-
A tow astern is veering from side to side on its towline. The best way of controlling the action is to().
-
In the context of MPLS,what is the correct action to be performed when an aggregate label is received ?()
-
The steam supply to the heaters is controlled by the (), which must be sited in close p
-
In the project environment, the individual ultimately responsible for quality control is:
推荐题目
- 山羊的平均妊娠期是()天。
- 概括来说,财务报表分析的内容包括的内容有()。
- 胸部左侧刮痧方法正确的方向是()。
- 用于悬浮催化剂配制的油/脂比例一般是()。
- 煤磨出磨气体温度越高,越易出现()。
- 在机组运行期间,以及正常或事故停机过程中,甚至在停机后一段时间内,需要连续供电并具有恒频恒压特性的负荷,属于()。
- 班组、岗位(个人)经济责任制的制定,总要求是目标明确、内容全面、指标先进、要求具体和()。
- 患者,男,10岁,前牙外伤6小时,没有身体其他器官系统损伤。视诊11近中切角露髓,21号牙近中切角缺损,未见明显露髓点。21牙的处理方案是()
- 施工项目管理规划大纲分为旌工项目管理()和施工项目管理实施规划
- 地层或岩体之间有可能以断层相接触,其接触面即为()C)