A load line of a ship is assigned by the().
相似题目
-
Compliance with the terms of the load line certificate on a ship is the responsibility of the().
-
The helicopter deck of a ship must be marked with the units identification,appropriate aiming circles,and a continuous line on the perimeter which is().
-
When a ship is in summer zone and in seawater of density1025,she must not load to more than the upper edge of the line marked().
-
When a ship is in tropical zone and in seawater of density 1025,she must not load to more than the upper edge of the line marked().
-
In a storm,the leeward lines of a ship’s mooring system will().
-
A branch line valve of a fire extinguishing system on a ship must be marked with the().
-
A ship is responsible for the cargo loaded or unloaded().
-
Compliance with the terms of the load line certificate on a vessel is the responsibility of the().
-
The primary purpose of a load line is to establish required().
-
The International Load Line Certificate is a document indicating () of the various load lines of the vessel.
-
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
-
In a storm,the windward lines of a ship’s mooring system provide().
-
When a ship in loaded condition floats at arbitrary water line, its displacement is to the relevant mass of water displaced by the ship()
-
The condition where a ship on the end of a tow line is riding a wave crest at the same time as its tug rides a wave crest is known as riding in().
-
The International Load Line Certificate is a document indicating the()of the various load lines of the vessel.
-
()is the main center-line structural member,running fore and aft along the bottom of a ship,sometimes referred to as the backbone.
-
The displacement of a ship is to the total weight, all told, of the relevant loaded ship()
-
When loading containers into the cell guides in the hold of a container ship,which statement is TRUE?().
-
A load line for a ship is assigned by the().
-
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
-
Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().
-
On a ship crane,the load chart relates the allowable load to the combination of boom length and().
-
A vessel is equipped with two ships service generatorsGenerator 1 is rated at 900 kW and generator 2 is rated at 600 kWDuring parallel operation, with a hotel load of 1,000 kW, what should be the kW load on generator 2 _____.
-
Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the mid-ship section results in the load’s ______.
推荐题目
- 腹股沟反射区的施术手法。
- 硫的危害在于()。
- 埋置深度在()以内且能用一般方法施工的基础被称为浅基础。
- 在建设社会主义和共产主义事业的奋斗进程中,共产党是()。
- 沥青混凝土路面中,直接承受行车荷载较大的竖向力、水平力和冲击力作用的是()。
- 阶步
- ()属于海洋运输保险一般附加险的保险责任。
- 第177题:某工厂为了节省投资, 将4年前为第l个大型厂房做的勘察成果提供给设计院, 作为同一厂区建设第2个大型厂房的设计依据。设计院被迫同意使用旧的勘察成果进行设计。该厂房建成后使用仅1年多就发现墙体多处开裂。经检测, 墙体开裂系设计中对地基处理不当引起厂房不均匀沉陷所致。根据《建筑法》和《建设工程质量管理条例》有关规定, 该质量责任的主要承担方是()。
- 经营者收购、销售商品和提供服务带有价格附加条件时,不标示或者含糊标示附加条件的,属于()
- 李老师从家骑自行车去学校,每小时行17.5千米,0.16小时到达,如果他改为步行,每小时. 李老师从家骑自行车去学校,每小时行17.5千米,0.16小时到达,如果他改为步行,每小时行3.5千米,0.8小时能到达学校吗?