Loss or damage caused by cutting away wreck or parts of the ship which have been previously carried away or are effectively lost by accident shall not be made()as general average.
![](/upload/20220827/c85071da6ff0aadc10ebce6c25bb4f0d.png)
相似题目
-
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
-
Banks have no liability for any delay or loss caused by postal or telex failure.
-
Any partial loss or damage shall be()pro rata on the basis of such declared value.
-
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
-
Damage caused by lighting,a storm,or a sudden gust of wind may be within the exception of ().
-
Damage to cargo caused by fumes or vapors from liquids,gases,or solids is known as().
-
Dunnage may be used to protect a cargo from loss or damage by().
-
The word “critical” in the sentence “This is a critical period as any loss of propulsion, or steering, can lead to collision, grounding, or other damage to the ship” can be best replaced by ().
-
In tanker trade,the signing by master the documents relating to the use of jetties and berths ()the shipowners thereby to pay for any damage caused to the jetties or berths by the vessel’s using them.
-
Even if the Shipowner is liable for the loss of or damage to the goods whilst in his custody,his()may have been limited by a clause in the contract or by statute,so that the owner of the cargo will be unable to recover the full amount of his loss.
-
Damaged bulkheads often take a permanent set which is independent of the panting or bulge caused by water pressure. To control this,you should().
-
Damaged bulkheads often take a permanent set which is independent of the panting or bulge caused by water pressure. To control this, you should().
-
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
-
Continuous surging of turbocharger can be caused by() ①crash stop of engine ②increased back pressure after T-Ch ③fouled or damaged turbine nozzle ring
-
Partial loss or damage is not recoverable from the insurers resuhing from natural calamities under FPA coverage.()
-
PICC Ocean Marine Cargo Clauses such as FPA, WPA and All Risks do not cover loss of or damage to cargo caused by( ).
-
Product liability means that a manufacturer is liable for any injuries or damages caused by a faulty product because of poor workmanship or design.
-
Which of the following insurance coverage does not cover total loss of or damage to cargo caused by earthquake or lighting. ()
-
The risks covered in FPA, WPA and All Risks in PICC Ocean Marine Cargo Clauses are not the same but all of them cover loss or damage caused by the intentional act of the insured.( )
-
If the seller incurs losses or damages caused by ______ failure to perform the relevant obligations stipulated in the contract, the seller is entitled to ______ compensation from ______.
-
Institute Cargo Clause(B)covers loss of or damage to cargo caused by().
-
0271The word “critical” in the sentence “This is a critical period as any loss of propulsion, or steering, can lead to collision, grounding, or other damage to the ship.” can be best replaced by _____.
-
The damage ___________by theflood was so large that the buildings cannot be rebuilt in a short time. [A]to becaused [B]causing [C]caused [D]wascaused
-
Institute Cargo Clauses C covers loss of or damage to cargo caused byearthquake.()
推荐题目
- 下列()属于劳动法律事件
- 如何制定营销导向城市发展战略?
- 流脑病人高热时降温首选乙醇擦浴。
- “公共财政”可以定义为:政府为了满足其国民的公共需求,在提供公共产品与劳务过程中所从事的经济性收入、支出活动。
- 一病儿跌伤,X线照片为左肱骨下端骨骺分离。3周后到市医院就诊,接诊医生填X线申请单时将左写成右。放射科发现错后,拍了左手,却将一个"右"铅字贴在X线片上。入院后主治医师在主诉中写左,诊断中又写右,手术通知单上也写右。术前备皮时,病儿提到左臂受伤,护士仍给右臂备皮。手术医生术前曾去查看患者,检查了左臂,第二天手术时仍按病历在右臂上开了刀,暴露的关节囊未见异常时,经再次询问患儿,方发现开错了手术部位。
- 鼠笼式电动应免频繁起动,要尽量减少起动次数,在正常情况下,电动机空载连续起动次数不得超过()。
- 我们在利用逐差法处理数据时,要求数据的组数一般是( )
- 细辛的功效是()
- 工作时间供公司内部管理使用,不向客户进行公布()
- 17、宅急送2007-2008年左右的案例表明仓储规划不仅要从空间上对仓库的新建、改建和扩建进行全面系统的规划,规划实施的时机也至关重要。