Companycom has a p5 595 with no DVD configured on this server. How can they install the Virtual IO Server code?()
相似题目
-
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()
-
Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()
-
A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()
-
Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux. How would access be provided to the storage subsystem devices for this Linux LPAR?()
-
Company.com has an EMC disk array and would like to connect it to a Virtual I/O Server on a pSeries p5-520. How can the EMC device drivers be installed?()
-
A client has tried to update the firmware of an Ethernet adapter on a p5 590, however it repeatedly fails. What is the most likely cause of this problem?()
-
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
-
Company.com has a 2 processor license for SLES 9 and a 2 processor license for AIX V5.3. Which of the following LPAR configurations is valid on a 4-way p5-550?()
-
Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()
-
For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()
-
Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()
-
Companycom purchased a new p5 570 without a HMC. The customer does not know how to power the full frame/system off since there does not appear to be an on/off button. What can be done to accomplish this task?()
-
Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()
-
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
-
Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()
-
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()
-
Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()
-
A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()
-
Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()
-
Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()
-
After installing a new p5 595, the system performs poorly. Which of the following services would provide updates needed to fix the problem?()
-
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()
-
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()
-
Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()
推荐题目
- 罗经点方向SE/S换算成圆周方向为()。
- 男,22岁,发现左胸前壁无痛性肿物3个月。查:左胸前壁有一直径约6cm包块,皮肤温度不高,无压痛,有波动感。入院后查血沉6mm/h。下列治疗措施哪项是错误的()
- 男,53岁,右胸不适,咳嗽咳痰月余,近1周痰中带血无发热,吸烟30年,每日吸烟16支。经检查诊断为鳞状细胞癌,治疗为()
- 瓜柱/侏儒柱/蜀柱
- 职业生涯设计的主要责任在于()。
- 在设置在报表每一页的底部都输出的信息,需要设置()。A.报表页眉B.报表页脚C.页面页眉D.页面页脚
- 37、在共同共有中,共有财产不分份额。只要共同共有存在,共有人对共有的财产就不划分个人的份额。只有在共同共有关系终止之后,才能确定各共有人的份额,以分割共有财产。
- 郝女士,27岁。孕38周,因胎儿窘迫行剖宫产术,术中见羊水Ⅱ度粪染,出血430ml,术后5天连续体温38~39℃:,诊断为产褥期感染,出现下列哪种体征支持此诊断
- 建设项目工程质量等级评定,采用单位工程优良率和建设项目工程质里评分值的指标控制。()
- 14、货币供给的低增速最可能与下列哪种情况联系在一起?()。