A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()
相似题目
-
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
-
Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux. How would access be provided to the storage subsystem devices for this Linux LPAR?()
-
A new LPAR has been created that needs SAN attached disk for a database. After AIX has been installed, the fibre cables are attached to the adapters. How should the administrator configure the disks?()
-
Companycom has a p5 595 with no DVD configured on this server. How can they install the Virtual IO Server code?()
-
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
-
An LPAR has hung during a reboot, reporting a 0552 LED code. What does this signify?()
-
Company.com has a 2 processor license for SLES 9 and a 2 processor license for AIX V5.3. Which of the following LPAR configurations is valid on a 4-way p5-550?()
-
An administrator is installing AIX 6.1 on a new LPAR and the boot sequence has stalled with reference code 0c31. What is the most likely cause?()
-
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
-
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
-
An administrator is installing AIX 6.1 on a new LPAR and the boot sequence has stalled with reference code 0c31. What is the most likely cause?()
-
A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy. Which of the following statements correctlydescribes the dual HMC environment? ()
-
A customer has raised a question about a recently installed LPAR. What command would the administrator run to obtain information about the processor entitlement?()
-
SuSe Linux Enterprise Server (SLES) has been installed on an LPAR on a p5 570, but the client is having problems directly after installation with slow network performance. What is the most probable cause?()
-
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
-
In order to support Live Partition Mobility (LPM) for a given LPAR between two Power servers, which type of backing device should be chosen for the storage devices presented from the VIO server to the LPAR?()
-
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()
-
An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
-
A new LPAR has been created that needs SAN attached disk for a database. After AIX has been installed, the fibre cables are attached to the adapters. How should the administrator configure the disks?()
-
An LPAR has hung during a reboot, reporting a 0552LED code. What does this signify?()
-
An administrator is installing AIX 6.1 on a new LPAR and the boot sequence has stalled with reference code 0c31. What is the most likely cause?()
-
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()
-
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
-
A new LPAR has been created that needs SAN attached disk for a database. After AIX has been installed, the fibre cables are attached to the adapters.How should the administrator configure the disks?()
推荐题目
- 以下哪种不寐类用药无益气、安神的作用()
- 电子商务促进了企业基础架构的变革和变化。
- 我国广泛使用的脊髓灰质炎疫苗是()。
- 对于解决沿海岛屿、交通不便的边远地区、地广人稀的草原牧场,以及远离电网的农村、边疆等地方的生产和生活用电问题,风力发电有着()的效果,正是在这样的情况下,风力发电迎来了发展的春天。从20世纪70年代开始,世界各国加快了研究风力发电和建设大中型风力发电场的努力。
- 工作分析是一种确定某项工作任务和性质的一种人力资源管理技术,包括职务描述和工作说明书,大多工作说明书一般包括以下哪几项()。
- 下列有关生物群落演替的叙述错误的是()。
- .某男子一日摄入膳食叶酸100ug,摄入膳食补充剂100ug,那么此人摄入的膳食叶酸当量为
- 学制具体规定着()
- 【判断题】克鲁格曼认为政府对经济的干预是必要的。()
- 独立检察官是专门对某一高级行政官员的贪污受贿或其他违法失职行为进行调查起诉的临时性官员,其起诉对象包括总统、副总统、各部的正副部长及相应职务的官员等。()