My ship sailed()port of Shanghai, bound()Rotterdam.
相似题目
-
The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().
-
()of my ship’s propeller is very strong.
-
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
-
he Port Authorities, in accordance with the IMO resolutions have been carrying out () to enhance safety of ships.
-
Where the Shipowner has accepted the port of discharge named by the Charterer,he must go there although it is not prospectively safe,and claim damages for injury()the ship by reason of the port not being safe.
-
My ship will arrive()Port Said()Sunday.
-
Please supply 200 tons of fresh water()my ship.
-
Our ship will arrive()Port of Hongkong on Sunday.
-
If the ship is delayed by reason of Charterer’s failure to name a port,()will be liable for the damages.
-
At that time my ship and others were()within 40 degrees of the compass.
-
()means a plan developed to ensure the application of measures designed to protect the port facility and ships, persons, cargo, cargo transport units and ships stores within the port facility from the risks of a security incident.
-
My last port of call was Hongkong and destination()Lima.
-
Four years()my ship called at this port.
-
Maritime Declaration of Health is to be rendered to () by the master of ship arriving from port outside the territory.
-
The certificate of nationality () serves as evidence of the nationality of the ship () shows the port of registry.
-
The port clearance for a ship should be granted()the completion of loading or discharging in the port.
-
Prior to being able to sail in a US port,each vessel that carries grain in bulk must have a certificate of loading issued by the().
-
If there are any Certificates expired or nearing expiry the master of a ship must shall apply fortheir () at any port.
-
According to the stowage factor of the cargo,my ship will()take 350 more metric tons of cargo.
-
A vessel sailing from Liverpool to New York puts into Boston,Mass. for emergency repairs. If no inward foreign cargo is to be discharged at that port,which of the following documents is required?()
-
To whom should the master render the Maritime Declaration of Health when the ship arrives at a port outside the territory?().
-
Port of destination is the port where goods are shipped and depart.
-
The modern sailing ship was developed by a man who never went to sea. He was Prince Henry of Portugal, the younger son of the Portuguese king and in English princess.
-
When under charter, all sailings of the ship are __ to chaterer’ s requirements.