The Shipowner is not()by the fact that a remote cause of the loss was an excepted peril.
相似题目
-
If the vessel does not arrive by the canceling date,and the Charterer()expenses,these expenses can be claimed by him from the Shipowner where they are in the reasonable contemplation of the parties.
-
Where the Shipowner has accepted the port of discharge named by the Charterer,he must go there although it is not prospectively safe,and claim damages for injury()the ship by reason of the port not being safe.
-
The original Bill of Lading,once signed by the Master,is NOT().
-
Although goods have been lost or damaged whilst in the custody of the Shipowner,()not necessarily responsible,for his liability in respect of them may have been excluded by the rules of common law or by the express terms of the contract or by statute.
-
If the bill of lading()contain a space in which the shipper can insert the declared value of the goods,the Shipowner is not entitled to limit his liability.
-
()is the price paid to a Shipowner for the transportation of goods or merchandise by seafrom one specific port to another.
-
The Shipowner may do what is reasonable()any of these liens in view of the fact that they are possessory liens,i.e. they can only be enforced by retaining actual or constructive possession of the cargo.
-
Advance freight must()to the Shipowner even if the goods are lost (by excepted perils) before payment,where they are lost after the due date of payment; nor is it recoverable if the goods are so lost after payment.
-
A sum of money paid by the Shipowner to Charterer for completing loading or discharging a cargo in less time than that stipulated in Charter Party as laydays.It is().
-
The spread of fire is NOT prevented by().
-
Once the port has been named and accepted by,or on behalf of,the Shipowner,he can not afterwards refuse to go()__ on the ground that it is not safe.
-
()Charterer and Shipowner agreed on instructions which were ambiguous and were misinterpreted in good faith by the master,it was held that the Charterer could not hold the Shipowner liable.
-
Even if()vessel was unseaworthy,a Shipowner can still rely on the exception perils if the loss has not been caused by unseaworthiness.
-
If the ship is disabled by excepted perils while completing a voyage on which she was()at the time of chartering,the Shipowner will not be excused.
-
Which file is NOT controlled by the alog command?()
-
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
-
What kind of plant is NOT mentioned by the author?
-
Which of the following is not produced by Tyr?
-
Which of the following is not an addition mentioned by the speaker?
-
The term under which the Shipowner is not responsible for loading and discharging,stowage and trimming costs is ________ .
-
Which of the following is NOT written by Saul Bellow?
-
Which of the following is not written by Robert Frost?
-
Which of the following is NOT written by Jane Austen()?
-
The project team developing a new system is experienced in the domain. Although the new the new project is fairly large, it is not expected to vary much from applications that have been developed by t
推荐题目
- 最为常用,熬炼时泡沫少,制成的黑膏药色泽光亮,黏性好的基质是()
- 测控装置,交流板配置中,大CT变比和大PT变比填写不正确没有问题。
- 下颌骨骨折在拔牙过程中发生较少,若发生,一般多见于()。
- 哪一项不应列为腭扁桃体切除术的适应证()。
- 加热后用水急冷加热区,以加速金属的收缩,提高矫正效率的方法,称为()矫正法。
- 与肺的生理功能最有关的是()
- 现代体育在国际传播有哪些途径?
- 物种濒危等级的制定以及物种红色名录的编制是生物多样性优先保护规划制订的重要依据。
- 汽车在山地行驶时,操作应注意( )
- 有1台电焊机,额定容量为23kV.A,单相380V,负荷持续率65%,cosα=0.5,换算为等效三相负荷,其设备功率应是()。