Gary has planned to take a tour around the Great Lakes in the coming summer vacation and() great pleasure from the visit.
相似题目
-
Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()
-
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
-
An administrator plans to use bootable AIX media to boot a system into maintenance mode. The system is running AIX 5.3 TL09 with a64-bit kernel.The administrator has a selection of media available. Which media should the administrator use?()
-
You plan to set up the Automatic Workload Repository (AWR) baseline metric thresholds for a moving window baseline. Which action would you take before performing this task?()
-
A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy. Which of the following statements correctlydescribes the dual HMC environment? ()
-
A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()
-
A customer has a p650 on order and plans to put it in a current OEM rack. They are concerned that the p650 power supply may demand more current than the OEM PDU can provide. Which planning guide specification would provide the necessary requirements?()
-
A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()
-
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
-
“根据应急计划采取行动”可译成:TAKE ACTIONS ACCORDING TO EMERGENCY PLAN。
-
A solution provider has identified a number of risks with a configuration in a customer’s request for bid. What is the most appropriate action to take to mitigate those risks for the customer?()
-
A customer plans to implement SVC as part of a solution and has concerns regarding the resilience of the SVC architecture. The correct response to this concern is that SVC().
-
A system was rebooted and is taking a long time to return. The administrator has logged into the HMC and sees reference code 0c9. What does this mean()?
-
Your company has a single Active Directory Domain Services (AD DS) domain and 1,000 client computers. You are planning to deploy Windows 7 Enterprise to the client computers. You need to design a zero-touch installation strategy.()
-
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()
-
A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()
-
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
-
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()
-
You plan to take a closed database backup using operating system commands. Which three SHUTDOWN options are appropriate for this type of backup?()
-
If your vessel has a list to port due to negative GM and off-center weight,the first corrective measure you should take is to().
-
John has planned to some money every month so that he can buy a new car next year.
-
Where has Orascom Telecom planned to set up a third generation mobile network?
-
Choose the best option for the sequence of A and B. Once the gas cloud has reached a certain temperature, it is hot enough for nuclear fusion to take place. A= nuclear fusion takes place B= the gas cloud reaches a certain temperature
-
The organization shall undertake change in a planned and systematic manner , taking account of the review of the potential consequences of changes and taking action as necessary , to ensure the integr
推荐题目
- 44岁男性上腹部疼痛5年,以餐后半小时疼痛明显,服制酸药物可缓解。近1周上腹疼痛明显而行纤维胃镜检查时,胃镜刚进入食管后病人腹痛剧烈持续而加重。最可能诊断为()
- 健康促进规划的过程评价主要关注()。
- 患者女性,26岁,偶发胸闷、心悸。心电图如图5-23所示,应诊断为().https://assets.asklib.com/psource/2015090111053686152.jpg
- 墙面固定玻璃的方法主要有()。
- 中央预算单位根据住房管理制度改革的有关规定,可分别开设一个()专用存款账户,用于核算职工按住房制度改革政策规定交纳的购房款等资金。
- N2受体主要分布于骨骼肌,激动时骨骼肌收缩。
- 刑事诉讼中对人身伤害的医学鉴定有争议需要重新鉴定或者对精神病的医学鉴定,有权指定医学鉴定医院的是()。
- 从19世纪末期到20世纪初期,欧洲和美国都相继有人提出比较系统的管理理论。比如,在美国表现为泰罗创建的科学管理理论,在法国表现为法约尔的行政管理理论。此题为判断题(对,错)。
- 工程师法压井时,加重钻井液从井底经环空上返到井口的过程中应保持立管循环的总压力 ()
- Ⅱ型超敏反应主要特征是以细胞溶解或组织损伤为主。()