Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()
相似题目
-
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()
-
Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux. How would access be provided to the storage subsystem devices for this Linux LPAR?()
-
Companycom LPAR that is using a Virtual IO Server needs to be more highly available. How can this be accomplished using APV features?()
-
Companycom will be using Virtual IO Server to share Ethernet adapters. What can be done to prevent network failure of the client if a Virtual IO Server goes down?()
-
Companycom has a p5 595 with no DVD configured on this server. How can they install the Virtual IO Server code?()
-
Companycom is installing a Virtual IO Server to reduce the number of fibre channel adapters needed for each partition. The customer wants to use disk based copy functions to replicate the data on the LUNs. How can this be accomplished?()
-
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
-
Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()
-
Companycom has restored their mksysb. They notice that the external volume groups cannot be seen. What should be done to access the volume groups?()
-
Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()
-
Companycom purchased a new p5 570 without a HMC. The customer does not know how to power the full frame/system off since there does not appear to be an on/off button. What can be done to accomplish this task?()
-
Companycom is implementing a pair of Virtual IO Servers to service four LPARs. If each operating system image requires 15GB of disk space, what is the minimum amount of SCSI resource necessary?()
-
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
-
Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()
-
Companycom has five LPARs, but only one CD drive. How should the CD drive be shared among all the users without system administrator action?()
-
Companycom needs to run a 32 bit kernel under AIX 5.3. What steps need to be done to accomplish this with the least disruption since the system is already installed with a 64 bit kernel?()
-
Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()
-
One of the key decision making factors in a very competitive opportunity will be cost. Companycom needs an aggregate rPerf rating of 120. What is the best solution?()
-
Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()
-
Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()
-
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()
-
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()
-
Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()
-
Conversation 2 17.A. He has got a summer job C. He has just visited a park B. He has lost his job D. He has been to the beach
推荐题目
- TFDS动态检查”的检查范围和预报质量标准规定:提速铁路货车车体地板、端墙板无破损。
- 《医院感染管理规范》中规定,导管室(含介入治疗)一次性使用导管不得重复使用。
- 关于老人的外貌描写,说法正确的是()。
- 根据阀瓣结构形式止回阀可分为单瓣和()阀。
- 红细胞的平均寿命一般是()。
- 按照(),公司信贷产品的基本形式,各种硬件和软件的集合,包括营业网点和各类业务,属于公司信贷产品中的基础产品。
- ()应依据借款人合理资金需求量和承贷能力来确定。
- 钳工锉上的底齿纹与锉身中心线成()角。
- 下列关于达尔文进化论的说法正确的是()
- 3岁病儿,体重13kg。因急性肠梗阻在全麻下行肠切除、肠吻合术,术前Hb为120g/L,Hct为37%。病房补液约200ml/8小时,术前禁食禁饮时间8小时,持续胃肠减压经胃管内引流出60ml胃液/8小时。手术历时3小时,出血70ml,补液总量300ml/3h。问1术前应注意该患儿存在的液体丢失量包括哪几方面?210kg小儿24小时内每小时生理输液量是多少?3该患儿总有效循环血容量约有多少ml?4