Companycom has a p5 595 with no DVD configured on this server. How can they install the Virtual IO Server code?()
相似题目
-
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()
-
Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()
-
A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()
-
Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux. How would access be provided to the storage subsystem devices for this Linux LPAR?()
-
Company.com has an EMC disk array and would like to connect it to a Virtual I/O Server on a pSeries p5-520. How can the EMC device drivers be installed?()
-
A client has tried to update the firmware of an Ethernet adapter on a p5 590, however it repeatedly fails. What is the most likely cause of this problem?()
-
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
-
Company.com has a 2 processor license for SLES 9 and a 2 processor license for AIX V5.3. Which of the following LPAR configurations is valid on a 4-way p5-550?()
-
Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()
-
For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()
-
Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()
-
Companycom purchased a new p5 570 without a HMC. The customer does not know how to power the full frame/system off since there does not appear to be an on/off button. What can be done to accomplish this task?()
-
Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()
-
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
-
Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()
-
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()
-
Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()
-
A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()
-
Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590 running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual IO?()
-
Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()
-
After installing a new p5 595, the system performs poorly. Which of the following services would provide updates needed to fix the problem?()
-
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()
-
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()
-
Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()
推荐题目
- 防止胶带边缘磨损的办法是()。
- 一般林木种子的生产经营许可证,由哪级部门核发?
- 根据我国《保险法》的规定,保险事故发生后,投保人、被保险人或者受益人以伪造、变造的有关证明、资料或者其他证据,编造虚假的事故原因或者夸大损失程度的,保险人对其虚报的部分不承担赔偿或者给付保险金的责任()
- 骑士文学是西欧中世纪反映骑士阶层生活和理想的文学,骑士传奇按题材可分为哪三个系统?
- 紧急避险超过必要限度造成不应有的损害的,应当负刑事责任,但是应当()处罚。
- “生产资料所有制”中的生产资料淡化,开始抽象化为()关系。
- 酒精中毒的分期不包括( )
- 10、45岁的一中年人为锻炼身体准备购买体育用品和选择运动场地,他在羽毛球和网球运动中选择了去体育馆打羽毛球,则这两种运动之间是()。
- 应用后宜用温水或0.9%氧化钠溶液漱口的剂型是
- 安全生产监督管理部门和其他负有安全生产监督管理职责的部门依法开展安全生产行政执法工作时,生产经营单位可以以技术秘密和业务秘密等理由拒绝检查()