The loading of the ship must be done in accordance with().
相似题目
-
The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().
-
Compliance with the terms of the load line certificate on a ship is the responsibility of the().
-
The ship will be responsible for the cargo loaded or unloaded().
-
Structural stress levels in a ship are the sum of loading stresses and stresses due to().
-
On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().
-
When a ship is in summer zone and in seawater of density1025,she must not load to more than the upper edge of the line marked().
-
The reason for the obligation to load a full cargo()that otherwise the Shipowner would lose freight on account of some part of the ship’s carrying capacity not being utilized.
-
When a ship is in tropical zone and in seawater of density 1025,she must not load to more than the upper edge of the line marked().
-
A load line of a ship is assigned by the().
-
()is the draft of your ship at full load?
-
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
-
The ship has()of more than 10 meters at full load.
-
When a ship in loaded condition floats at arbitrary water line, its displacement is to the relevant mass of water displaced by the ship()
-
The port clearance for a ship should be granted()the completion of loading or discharging in the port.
-
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
-
The displacement of a ship is to the total weight, all told, of the relevant loaded ship()
-
When loading containers into the cell guides in the hold of a container ship,which statement is TRUE?().
-
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
-
Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().
-
On a ship crane,the load chart relates the allowable load to the combination of boom length and().
-
The load limitation of governor should be reduced when ship navigating at sea, the main reason is to()
-
84. The loading of the ship must be done in accordance with _____.
-
Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the mid-ship section results in the load’s ______.
推荐题目
- OS2主站UPS电源系统蓄电池后备时间不小于()小时。
- 镇痛作用强()
- 烟叶在储存过程中,()发生变化。
- GSM系统根据所用频段可分为GSM900MHz和GSM1800MHz,GSM900系统载频间隔为()
- 鞍钢不生产的重轨的规格有()。
- 将被测零件臵入线圈内,当线圈通以直流电时,().
- 交通事故物证的种类主要有肇事车辆、事故造成的各种()、事故中的各种附着物、交通事故现场散落物等。
- 钢轨焊机夹紧压力大小的选择。不应小于()的顶锻压力。
- 中铁集装箱运输有限责任公司负责全路集装箱运输组织和统一管理。此题为判断题(对,错)。
- 慢性乙肝患者,化验乙肝五项指标, HBsAg()抗HBc(),HBeAg(),ALT120U/L。其意义是()