A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()
相似题目
-
Which is a supported method to upgrade firmware on an IBM Power Systems 570?()
-
When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()
-
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
-
Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()
-
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
-
Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()
-
A customer has a new Power 720 with PowerVM Standard Edition. They plan to migrate their single-partition POWER5 550 to the new Power 720. How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()
-
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
-
A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()
-
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
-
A customer has just received three enterprise systems that support a total of 48 LPARs. Which installation method expedite the process?()
-
Where is specific information regarding height, width, depth, and weight of a Power Systems server located?()
-
Which of the following best describe the customer benefit of creating a systems acceptance test plan in the design phase?()
-
A large enterprise customer needs a standardized way to backup user data from multiple systems to tape. What solution will meet this need?()
-
A customer wants to monitor energy consumption for all of their IBM systems. What part of the IBM Systems Director family supports this function?()
-
A customer has a Linux server farm and wants to use IBM Director to manage all of their systems. Which of the following is the preferred installation of IBM Director to fully manage the Linux systems?()
-
Which of the following is the correct command to document a Power Systems server using sysplan?()
-
Which of the following is the correct command to document a Power Systems server using sysplan()?
-
A customer has a wide range of IBM enterprise disk systems and wants to manage copy services functions. Which of the products should the storage specialist recommend to this customer()
-
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()
-
A customer requires management capabilities for installed pSeries systems via a Microsoft Windows system. Which of the following should be considered?()
-
A customer’s server is experiencing slow application response due to lack of processor power. In which one of the following systems would the addition of the Expand On Demand processor upgrade feature benefit future expansion?()
-
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
-
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()