If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().
![](/upload/20220827/c85071da6ff0aadc10ebce6c25bb4f0d.png)
相似题目
-
If the Charterer nominates an unsafe port and the ship is damaged through going there,() will be liable for the damage,subject to that the master acts reasonably in going there.
-
If the ship is delayed by reason of Charterer’s failure to name a port,()will be liable for the damages.
-
If the buoyant force on a ship’s hull is equal to the displacement tonnage,the ship will().
-
The distance that a ship moves forward with each revolutionof its propeller,if there is no slip,is called().
-
You are making a telephone call ship-to-shore using the VHF-FM service.You can tell that the working channel is busy if you hear().
-
If a full cargo is not loaded,the Charterer must pay not only freight on the goods actually shipped but also().
-
A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship’s officers to().
-
Where a clause in a charter-party stated Charterers to have full use of the ship’s gear as on board,it was held()this did not imply that the Charterers were to be responsible for stowage.
-
On commonly used ships,if two A√Cgenerators are operated in parallel, the load is distributed evenly by ().
-
A claim for cargo damages may be held against the ship owner if such damage is the result of failure of the ship’s officers to().
-
Prior to burning or welding on a fuel tank on a ship,regulations require that an inspection be made. An entry in the unofficial logbook is required if this inspection is made by().
-
If a ship is proceeding towards the magnetic equator,the uncorrected deviation due to permanent magnetism().
-
A tug would NOT assist a ship to steer if the tug is made up to the large vessel().
-
]If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.
-
If the Charterer loads or discharges the vessel in a shorter time than is allowed to him by the lay days,he may be entitled to().
-
If the ship is disabled by excepted perils while completing a voyage on which she was()at the time of chartering,the Shipowner will not be excused.
-
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
-
If the buoyant force on a ship’s hull is equal to the displacement tonnage, the ship cause().
-
The basic shipping paper that forms an agreement between a shipowner and a charterer is a ().
-
If laytime is exceeded, the charterer must pay __________ to the ship owner.
-
Under a time charter, the hire is payable in advancefor a month or other period.If the hire is not paid promptly the()may be entitled to cancel the charter.
-
Time chartering means that the shipowner provides a designated manned ship to the charterer, and the charterer employs the ship for a specific period against payment of hire. ()
-
There are three principal methods of chartering a tramp ship, they are ().
-
The()means that the ship-owner provides a designatedmanned ship to the charterer, and the charterer employsthe ship for a specific period against payment of hire.
推荐题目
- 沫泵站应满足在泡沫消防泵启动后,将泡沫混合液或泡沫输送到最远保护对象的时间不宜大于()min。(易)
- 为了检查泵的工况,在启动离心泵前需要()。
- 正常总胆管宽径不应超过()
- 《招标投标法实施条例》规定,招标人发售资格预审文件、招标文件收取的费用应当包括( )。
- ()是诗人()早期的一首咏史诗,诗中赞颂了侯嬴慷慨任侠之举,也表达了诗人渴望有人赏识的心理和对建功立业的热望。
- 非电气化区段电气集中站常用的轨道电路为()轨道电路。
- 促进人与自然的和谐,是人类以及人类的每个个体持续、健康发展的重要条件。
- 施工单位违反施工程序,导致一栋正在建设中的楼房倒塌,造成2名工人死亡,直接经济损失900余万元人民币,根据《生产安全事故报告和调查处理条例》规定,该事件属于()事故。
- “武汉交警”3.0版本的微信缴纳罚款服务,提供了一种协同式、复杂程度相对较高的公共服务,呈现出社交媒体采纳过程模型第四个阶段的基本特征。
- 10、杜威的实用主义教学论主张“从发现中学”